Working on the well when I could.
Very happy with the results.
I have attached photos of the AIR 200 install. It was a breeze to install. Only took 2 old guys less then 5 hours to get it up and running. Works great right out of the box and so much so we added a second diffuser to the system.
We finished installing the last solar panel and ran the pump for a while. It read between 3000 and 3300 rpm and 51-54 hz. We put automotive wire loom on the wires that connects the panels and spiral hose protector on the two wire that span in between the posts. These are a few pictures of our project that you an RPS helped us with. We will continue next spring with burying the pipe to the storage tanks and hopefully get some of the watering troughs installed.